INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

Why should fuel conversion requests be reviewed by the manufacturer and qualified installer in a commercial laundry?

Fuel conversion affects equipment compatibility and installation requirements.

Fuel conversion affects equipment compatibility and installation requirements. It must be assessed through the manufacturer's approved arrangements and qualified local personnel. Do not attempt a conversion based on a generic parts list or an assumed similarity between fuels. Keep the resulting identification and documentation consistent with any authorised configuration change.

Obtain a written assessment for the exact machine and proposed fuel. A conversion request should never become an operator adjustment or an assumption based on another dryer's configuration.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation