INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

Why should labor and utilities be assessed together in laundry costs?

Utility savings and labour requirements should be considered together because a change in batch size or workflow can affect both.

Utility savings and labour requirements should be considered together because a change in batch size or workflow can affect both. Record loading, transfers, unloading and finishing as well as machine running time.

A lower utility estimate may not describe the total operating cost if additional handling is needed. Compare alternatives over the same finished workload and staffing assumptions. Include bottlenecks and waiting time explicitly rather than assuming operators spend every machine-cycle minute on productive work elsewhere.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation