A moisture figure without load composition is difficult to use. Cotton towels, synthetic uniforms and mixed bedding do not represent the same drying workload even when their dry weights match.
Record fabric family, batch weight and the proportion of unusual or bulky items beside the measurement. This makes comparisons more useful when stock changes. It also helps a supplier evaluate a proposed washer and dryer combination using the actual textiles rather than a single average that conceals very different processing needs.
Back to news & insights