Check the complete route from unloading to final position, including turns, doors, lifts and temporary obstructions. Use packing and machine dimensions appropriate to each movement. Obtain qualified handling advice where required. Discovering a restriction after arrival can delay installation even when the machine itself matches the order correctly.
Check the entire route to the final position, including turns and overhead restrictions. A machine passing the main doorway does not prove it can reach the installation point.