XGQ-X Commercial Washer-Extractor
Available capacities: 16 / 22 / 25 kg.

The XGQ-X commercial washer-extractor series is available in 16 kg, 22 kg and 25 kg capacities. The models share the exterior design shown, with different drum sizes, power ratings and machine dimensions.
Capacity and model differences
16 kg — XGQ-16X
- Drum size (diameter × depth): 730 × 380 mm.
- Washing speed: 40 rpm; uniform rotation speed: 80 rpm.
- Motor power: 2.2 kW; inverter power: 2.2 kW; heating power: 9 kW.
- Overall dimensions: 980 × 980 × 1440 mm.
- Machine weight: 480 kg.
22 kg — XGQ-22X
- Drum size (diameter × depth): 730 × 540 mm.
- Washing speed: 37 rpm; uniform rotation speed: 72 rpm.
- Motor power: 3 kW; inverter power: 3.7 kW; heating power: 7.5 kW.
- Overall dimensions: 980 × 1150 × 1440 mm.
- Machine weight: 545 kg.
25 kg — XGQ-25X
- Drum size (diameter × depth): 800 × 500 mm.
- Washing speed: 37 rpm; uniform rotation speed: 72 rpm.
- Motor power: 3 kW; inverter power: 3.7 kW; heating power: 9 kW.
- Overall dimensions: 1060 × 1150 × 1485 mm.
- Machine weight: 650 kg.
Shared specifications
- Medium spin speed: 400 rpm.
- High spin speed: 860 rpm.
- Door diameter: 420 mm.
- Hot-water and cold-water connections: DN20.
- Drain diameter: 75 mm.
- Water consumption listed in the brochure: 255 kg for each model; confirm the wash programme and operating conditions for your application.
Request a quotation
Tell us your required capacity, textile type, electrical supply and installation space. Request the current model-specific technical sheet and installation drawing before ordering. Specifications are subject to change. OEM and ODM enquiries are welcome.
Need a technical data sheet? Include your destination, available power supply and required capacity in your enquiry.
What’s next for your laundry?
Let’s find the equipment that fits your project.
