INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

Inside MEIDI’s 18,000-square-metre laundry equipment factory

Explore MEIDI’s Shanghai manufacturing site through its assembly, showroom, washing, drying and component production areas.

MEIDI's 18,000-square-metre factory is located in Shanghai's Fengxian District. Our factory gallery brings together photographs of the assembly workshop and equipment showroom, followed by the washer-extractor, tumble dryer and component production workshops.

## Start with the equipment and assembly areas
The assembly workshop offers a broad view of machines within the manufacturing environment. The showroom provides additional views of equipment exteriors, doors and control layouts. For a buyer comparing machines, these views are useful starting points for a more detailed conversation about loading access and the space required around the selected model.

A photograph does not replace a dimensioned installation drawing. When planning a delivery route or laundry layout, request the dimensions and access requirements for the configuration being quoted, including the space needed for operation and servicing.

## Plan a focused factory discussion
Before discussing a visit, prepare a short equipment list and describe the laundry you intend to operate. Include the textile types, expected daily volume, destination and any OEM or ODM requirements. This gives both teams a clear agenda for reviewing equipment and project details.

The factory gallery is organised by workshop so you can move from the overall production setting to washing equipment, drying equipment and components. Contact MEIDI to discuss your project and arrange the next steps.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation