INDUSTRIAL & COMMERCIAL LAUNDRY EQUIPMENTShanghai, China +86 132 6270 7969
MEIDILAUNDRY EQUIPMENT
Commercial Laundry Equipment. Direct from the Manufacturer. OEM & ODM Available. MEIDI washers, dryers and stacked equipment.

MEIDI washer-extractor and tumble dryer capacity ranges

Compare MEIDI’s 15–130 kg washer-extractors, 12–120 kg tumble dryers and 50, 100 and 120 kg energy-efficient dryer range.

MEIDI's commercial and industrial laundry range brings washing and drying equipment into one project discussion. Washer-extractors are offered in 15, 20, 25, 30, 50, 70, 100, 110, 120 and 130 kg capacities. The tumble dryer range covers 12, 15, 20, 30, 50, 70, 100 and 120 kg capacities.

The energy-efficient tumble dryer range is listed separately, with 50, 100 and 120 kg options. Buyers can therefore distinguish that product family from the standard tumble dryer capacity listings when preparing an enquiry.

## Match the range to the workload
A capacity rating is a starting point for selection. The practical load also depends on the textile type, bulk and process. A laundry handling towels throughout the day has a different production pattern from one handling small batches of mixed uniforms or bulky bedding.

Record typical batch weights and the time available for washing, drying and unloading. Discuss the washer and dryer together so that one stage does not leave the other waiting unnecessarily. For bulky items, include their dimensions and care instructions in the enquiry.

## Prepare an equipment comparison
Ask for the technical details of each shortlisted configuration, including installation dimensions, electrical requirements and the heating arrangement. Share these with the people preparing the site before finalising the equipment order.

MEIDI accepts OEM and ODM enquiries. Contact our team with the required capacity, destination and project details for a quotation.

Back to news & insights

What’s next for your laundry?

Let’s find the equipment that fits your project.

Start a conversation