Industry insights
Practical questions to ask before choosing equipment.
What belongs in the total installed cost of laundry equipment?
The equipment price is only one part of an installed laundry.
What should Australian buyers include in a laundry project brief?
Include the installation address, electrical supply, available heating, water and drainage arrangements, plus a drawing of the laundry.
What should UK buyers confirm about a commercial laundry installation?
Ask your installer to review the actual electrical supply, water connections, drainage, floor requirements and dryer exhaust route.
What should Canadian buyers confirm before importing laundry machines?
Start with the installation location, actual electrical supply, heating source and the machine configuration you want to purchase.
What electrical information should a US laundry equipment buyer provide?
Tell the supplier the voltage, frequency and phase available at the installation point.
How do you convert washer capacity from kilograms to pounds?
One kilogram is approximately 2.20462 pounds.
How can you verify a laundry equipment supplier remotely?
Ask for company information, a current quotation and a live discussion of the specific equipment you intend to buy.
What should you check during a laundry equipment factory visit?
Arrange the visit around the machines and processes relevant to your proposed order.
What is the difference between OEM and ODM laundry equipment cooperation?
In a purchasing discussion, OEM commonly refers to manufacturing equipment for another brand, while ODM commonly includes design or development work.
What information makes a laundry equipment quotation more accurate?
A useful enquiry tells the manufacturer what must be processed, when it must be ready and where the machines will operate.
How should you compare two commercial laundry equipment quotations?
Put the quotations side by side by configuration, rather than comparing only the final price.
Why does a commercial dryer installation need incoming air planning?
For a vented dryer, the installation design must account for air entering the space as well as air leaving through the exhaust. The appropriate provision depends on the selected equipment and the building arrangement, so it should be assessed rather than improvised after installation.
What’s next for your laundry?
Let’s find the equipment that fits your project.
